Sign In | Join Free | My spintoband.com
spintoband.com
Huisins New Material Technology Co.,Ltd
Innovation and Environmental protection links us together
Home > Water Based Interior Paint >

Resistance Interior Wall Waterborne Primer

Resistance Interior Wall Waterborne Primer

Place of Origin : China
Brand Name : GD
Certification : ISO,SGS,ROHS
Model Number : I103
MOQ : 500L
Price : 3-5
Packaging Details : 18L/BARREL
Delivery Time : 7 workdays
Payment Terms : TT
Supply Ability : 1000MT/month
Contact Now

Resistance Interior Wall Waterborne Primer, using the high-performance emulsion, the introduction of functional groups, efficient alkali resistance, can effectively prevent the alkaline substances from oozing to damage the finish paint, but also possessed good mildew proof, Apply to indoor wall painting .

Features:

                    • 1,Nanometers in size: the good permeability and closure.

                      2,Efficient alkali resistance: Effectively prevent the coating from discoloring.

                      3,Introduction of special functional groups, strong adhesion, a firm base.

                      4,Good fit, fast drying, easy construction.

                      5,Effectively prevent the mould from breeding.

                      6,Free of APEO, no heavy metals.

  • Operating Instruction

  • Construction tool: Brush,Roller,Spray gun; a suggestion of using wool brush, short-haired roller, high-pressure airless spray gun.
    Paint Coverage:12-14㎡/Kg/single pass(30microns DFT).Paint consumption varies according to the surface condition of application and proportion of dilution.
    Paint mixing: Mixed uniformity to improve ease of application, must not exceed 20% by using clean water. If using non-gas spray, no more than 10%.
    Substrate treatment: Surface should be clean, dry and stable, moisture <10%, pH<10. Remove unstable old film by high pressure wash or scraper, whichever is appropriate, and then sandpapering.
    Application Condition: The temperature at 5-35℃, relative moisture greater less than 85%; to prevent excessive drying in summer and prohibit baking in winter, closing windows in sand-dust weather.
    Full/Curing Time(30microns DFT at 25-30℃) :
    ●Surface Dry: 30min ●Hard Dry: 60min●Recoating: interval at least 2h
    Cleanout: Clean all the tools with water timely when stopping paint on its way or completing the coating process.
    Storage and Shelf life: Store in a tightly sealed container, cool and dry place at 5-35℃, 12 months.



China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Resistance Interior Wall Waterborne Primer Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Huisins New Material Technology Co.,Ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0